
Transcription
CMAR QUALIFICATIONSTABLE OF CONTENTSCover LetterCMAR Firm Information1. Key Personnel Qualifications2. Project Experience (Similar Projects)3. Past Performance4. Project Implementation Plan5. Safety Program6. Miscellaneous Submittal Requirements7. Insurance and Bonding Capacity
COVERLETTER
CMAR QUALIFICATIONSCOVER LETTERIntroduction of the CMAR ContractorWE ARE PLEASED TO SUBMIT THIS RESPONSE FOR ADVANCE PLANNING FOR THE NEVADA STATE PUBLICWORKS DIVISION (SPWD).As a General Contractor founded and operating in Las Vegas for over 40 years, Martin-Harris Construction, Inc.(MHC) has built over 2,000 projects in the valley, constructing many of the parking structures, retail buildings,schools, offices and public works service buildings that shape our community. As a family run business employingover 350 locally based Associates, Martin-Harris believes whole heartedly in serving the community we live in. Inaddition to supporting local charities and business organizations, that responsibility extends to helping improve oureducational system, while cultivating the next generation of construction industry professionals.Martin-Harris is consistently listed as a leading contractor in publications such as “Top 10 Southwest GeneralContractor” by Southwest Contractor Magazine and Engineering News-Record’s “Top 400 General Contractors”.Vegas Inc. Magazine consistently ranks MHC #1 General Contractor by employee size in Las Vegas. The NationalAssociation of Industrial and Office Properties (NAIOP) has named MHC “Contractor of the Year” eight times in thelast eleven years. Martin-Harris has also recently been named “Safest Contractor of the Year” by the AssociatedGeneral Contractors.Martin-Harris Construction has the manpower, financial and bonding capacity to successfully complete all threeSPWD advance planning projects. Given our current workload and project completion dates, the timing of theseprojects, pre-construction and construction fits well in our backlog projections and team resources. We currentlyhave over 350 full time associates at Martin-Harris Construction and over 1 Billion in bonding capacity.martin-HarrisConstruction RANKED #1in Las Vegas by numberof employees.
CMAR QUALIFICATIONSCMAR ExpertiseThe exceptional track record in pre-construction and construction management established by Martin-HarrisConstruction has been built on the foundation of the complete integration of designer and contractor from projectinception to project closeout. In terms of delivery methods, in addition to a broad CMAR and Design-Buildportfolio, Martin-Harris has a wealth of experience and a high level of expertise in delivering preconstructionservices including negotiated lump sum prime contracts incorporating design-assist structural, mechanical andelectrical elements. Within the past ten years, Martin-Harris has put in place more than 800,000,000 worth of workutilizing a CMAR delivery system and, in the company’s history, has completed more than 75 CMAR/Design-Buildprojects. In fact, Martin-Harris completed Nevada Public Work’s 1st design-build project, the CSNTelecommunications project. Recent design-build projects with the City of Las Vegas include the Solar CoveredParking Lot “D” projects and the original Water Pollution Control Facility 3.5 MW Solar PV System. Recent publicworks design-build experience with Clark County School District includes the Variety School.Specific to Nevada Public Works experience with a CMAR delivery, Martin-Harris recently completed 2 projects forthe McCarran International Airport, the newly renovated building and tenant improvement for the Southern NevadaHealth District office, the new Legal Aid of Southern Nevada Office and a renovation for the Public EducationFoundation. Within the last four (4) years alone, the proposed Sr. Project Executive, Wade Pope, has put in placeover 265M worth of CMAR contracts for Martin-Harris Construction. The entire MHC project team has experienceworking on CMAR projects and working on CMAR projects together. Notably, the main team members justcompleted pre-construction and are in the process of finishing construction of two CMAR projects for Clark CountySchool District. Both projects include the new construction of elementary schools including technology labs andlibraries on campuses that have been active throughout construction. These CMAR projects represent a sounddemonstration of Martin-Harris and the Project Team’s ability to deliver a project in full compliance with NRSstatutes. The team is poised to bring their similar experience on a CMAR NV Public Works project to SPWBproviding well-established lines of communication and CMAR processes/protocols.As a General Contractor with self-performance capabilities, our team’s experience extends far beyond projectadministration and provides first hand trade knowledge for effective design constructability reviews, subcontractormanagement, and schedule coordination. Our self-performance capabilities provide the City with the addedassurance that subcontractor trades will be held to the highest levels quality and schedule adherence, with theresources to step in and provide manpower to control critical path items, should the need arise. In addition, Martin-Harris’s Estimating Staff is the largest in Las Vegas, bidding on over three-hundred (300) projects a year. Day in andday out, they are working with local subcontractors on a wide variety of budgeting and value engineering pricing, aswell as, soliciting hard bids. Our team has a superior level of knowledge regarding the current local market,materials and resources. Combined, our financial strength, construction knowledge and subcontractor relationsassure the SNPWB quality work, at a competitive price.
CMAR QUALIFICATIONSRELEVANT EXPERIENCE IN NEVADAEducational projects have truly been at the heart of Martin-Harris’s core business and strength. Martin-Harris hascompleted over 130 educational projects in our 40-year history within the State of Nevada. This portfolio includes abroad range of facilities, from Elementary, Middle and High Schools to Higher Education and specialty facilities forpublic, federal and private clients. For the College of Southern Nevada, Martin-Harris collaborated on the 1stNevada State Public Works Design-Build and 1st LEED Certified Project in Nevada: the CSN Morse Arberry, Jr.Telecommunications Building; The Ralph and Betty Engelstad School of Health Sciences on the West CharlestonCampus (both completed by proposed Superintendent Kenny Folkersen) and the Science Building on the WestCharleston Campus.Martin-Harris Construction has completed 3 CMAR campuses for the University of Phoenix, a tenant improvementfor Kaplan College, and three renovations for Roseman University. For the University of Nevada Las Vegas, wecompleted the Boyd School of Law and Design-Build of the Tropicana Parking Garage.In 2009, Martin-Harris began a CMAR & Design-Build “On Call”contract, successfully delivering another 18 projects on theoccupied campus, safely, over the years since.CSN ExperienceWe have completed over 100 on time, on (or under) budgetCSN Telecom Building (NLV Campus)CSN Health Sciences (W. Charleston)CSN Science (W. Charleston)renovations or additions to existing schools while they remainedUNLV Experienceprojects for Clark County School District (CCSD), 47 of which wereoperational. It was this experience and success that led CCSD tochoose Martin-Harris for the CMAR delivery of their two mostrecent replacement projects, Rex Bell and Lincoln ElementarySchools. Each campus is being demolished and brand new state-of-the-art facilities are being built to accommodate the high techneeds of today’s students. This selection was a true testament toMartin-Harris’s demonstrated value on complex and challengingCMAR educational projects on an occupied campus.We are pleased to present the same teamof highly qualified and talentedprofessions for the SPWB projects thathave spent the last 18 months working onthese two (2) CMAR projects for CCSD.UNLV Boyd School of LawUNLV Parking StructureUNLV Concrete ReplacementUNLV Solar TechnologyUNLV Potable WaterUNLV Lied Library IT ExpansionUNLV Campus Konami Gaming LabUNLV Clean Room ModificationUNLV South Trailer Site Parking LotUNLV Sewer RepairsUNLV Fume HoodsUNLV Wellness Center RemodelUNLV BSL & RAJ AV UpgradeUNLV RAJ & HCH PV (50 KW)UNLV FMA Lift FoundationUNLV High Bay BuildingUNLV Raj 4th Floor RemodelUNLV Thomas & Mack Center GridUNLV Dining CommonsUNLV BHS 517 Wall Addition
CMAR QUALIFICATIONSSafety of students, staff and visiting publicMartin-Harris’s safety record is unparalleled. We have built 85 projects on an occupied campus environment,thirteen (13) of which have received AGC Safe Site Awards, including CSN’s Science Building E – West CharlestonCampus. Overall, we have thirty-four (34) AGC Safe Site Awards and proposed Superintendent, Kenny Folkersen,has been the recipient of seven (7) of them, four (4) of which were educational projects. Our EMR is less than halfthe industry standard, an excellent rating that provides SPWD peace of mind while saving money on insurancepremiums.Point of ContactMARTIN-HARRIS CONSTRUCTIONGuy Martin, President3030 S. Highland Drive, Las Vegas, NV 89109Phone (702) 385-5257Fax (702) 384-7736www.martinharris.com [email protected] OF NEVADA LAS VEGASCLARK COUNTY SCHOOL DISTRICT4505 Maryland Parkway4190 McLeod DrDave FromerLas Vegas, NV 89154Phone (702) 895-2873Steve DrewsLas Vegas, NV 89121Phone (702) .netCLARK COUNTY REAL PROPERTY MANAGEMENTLEGAL AID OF SOUTHERN NEVADA500 S. Grand Central Parkway, 4th Floor725 E Charleston BlvdChuck James, Manager of Design & ConstructionLas Vegas, NV 89109Phone: (702) [email protected] NEVADA HEALTH DISTRICTAndy Glass, Deputy Director280 S Decatur BlvdLas Vegas, NV 89107Phone: (702) [email protected] Buckley ESQLas Vegas, NV 89104Phone: (702) [email protected]
CMAR QUALIFICATIONS
CMARFIRM GENERALINFORMATION
CMAR QUALIFICATIONSCMAR FIRM GENERAL INFORMATIONFirm InformationFIRM NAME & BUSINESS ADDRESS:Martin-Harris Construction, Inc.3030 S. Highland DriveLas Vegas, NV 89109YEAR ESTABLISHED: State of Nevada, 1976Ownership Type: CorporationName and Address of Parent Company: Not applicablePrincipal Personnel: Phone: (702) 385-5257Frank Martin, CEO (Operations) [email protected] Martin, President (Operations) [email protected] Toplak, Sr. Vice President (Operations) [email protected] Newmiller, Vice President of Preconstruction Services (Operations) [email protected] Shelton, Vice President Field Operations (Operations) [email protected] Johnson, Vice President Estimating (Estimating) [email protected] SIZE: 363 Employees
CMAR QUALIFICATIONSFirm Organizational ChartOne of the key advantages Martin-Harris brings to this project is the ability to utilize members of our SpecialProjects Group. The Martin-Harris Special Projects Group is a dedicated team catering to specific interiorconstruction requirements. This arm of Martin-Harris has specialty training, resources, and equipment catering tohigh intensity short duration projects. The team is locally based and readily available to provide manpower at anystage of the project. The MHC Project Manager and Superintendent’s ability to call on them will empower bothflexibility and control of the project schedule.
CMAR QUALIFICATIONSCurrent WorkloadMartin-Harris Construction has the current manpower, financial and bonding capacity to successfully accomplish allthree CMAR projects for the Nevada State Public Works Division.Project NameContract CarMax - Rancho - LV10.2MHoward Hughes Corporation V1516.0MAristocrat Gaming TI8.0MTurano Bakery15.5MMagnum Tower22.0MMarriot Residence Inn - Rancho Cucamonga17.7MSpringhill Suites Oakland22.0MEataly @ MGM45.0MCactus and Dean Martin Elementary School25.0MShanghai Plaza11.0MLamb Development Via West7.7MNorthgate (Amazon) Building 919.5MEmmerus - Sahara10.2MElysian @ Howard Hughes50.0MGateway Assisted Living19.5MAbode - Red Rock48.0MLegacy House 2 - Summerlin19.5MSan Francisco Marriott - Remington14.0MHilton City Center30.0MHilton - Golden Palm24.0MClark County Multi Use Facility17.0MSwitch Nap 10 Phase II10.0M
TAB1-KEYPERSONNELQUALIFICATIONS
CMAR QUALIFICATIONSTab 1 - KEY PERSONNEL ON THIS PROJECTProject-Specific Organizational ChartWith over 40 years of construction management experience, our team is poised to mitigate any potentialhindrances projects may encounter and provide SPWD with clear suggestions, making the efficient execution ofdecisions possible. From Executive Management through the Project Execution Team, Martin-Harris has assembleda team that is fully committed to ensuring that the project’s exact intentions and best interests are met andexceeded.** In the event Martin-Harris is awarded two of the SPWB CMAR projects, John Hallaway will be added as aSuperintendent to ensure 100% field supervision at each project site.*** In the event Martin-Harris is awarded three of the SPWB CMAR projects, Anne Folk will be added to Jon Cox’steam and Randall Maestas will be added as a Superintend on the third project site.
CMAR QUALIFICATIONSSimilar Size, Scope & RolesThe following project team will be supported through the life of the project by the full resources of our localcorporate office including accounting, information technology, human resource, equipment and warrantydepartments.SR. PROJECT EXECUTIVE – WADE POPEWade has 34 years of construction industry experience including an impressive educational project portfolio andover 265M of CMAR contracts for Martin-Harris. His supervision experience includes conducting monthly projectreview meetings and providing support to the onsite project teams. He has routinely provided review of generalconditions, bids, subcontracts, and schedules while overseeing pre-construction services and coordinatingresponsibilities between estimating and operations. As Senior Project Executive, his role will be to support theproject team with his extensive CMAR experience, support resolution to challenges as they arise, and provide keyoversight. His experience keeping a global perspective on project milestones and key components will be especiallybeneficial to these complex projects with regard to the logistical coordination between SPWB Management,University Representatives, campus staff, the Architect, and Engineers.SR. BUSINESS DEVELOPMENT DIRECTOR – CHRIS CALUYAChris is a results oriented executive with a diverse and proven background in construction management. He ishighly effective at CMAR, pre-construction coordination, design assist, project estimating, budgeting andscheduling. Chris has 33 years of experienced in commercial projects, both private and public. His CMAR experienceincludes new construction and renovations for multi-family/high-density housing, state and municipal facilities,retail, parking garages, higher education, K-12 schools, hospital, medical and correctional facilities. Chris will leadthe pre-construction phase of the project and take overall responsibility for coordinating all meetings/teamresources, capturing all information (meeting minutes, drawings, RFIs, etc.) in Martin-Harris’s cloud basedmanagement software (Procore), while ensuring 100% NRS compliance. Chris will combine his pre-construction andoperations expertise to lead constructability reviews, in tandem with the Project Manager and each Superintendent,with input from Key Subcontractors, to ensure CSN receives the best value on the Student Unions Project.Chris will be supported by our in-house BIM Coordinator, Steve Hong. Steve has over twenty years of experienceworking in various architectural, engineering, and design firms supporting and managing AutoCAD and Revit. Hewill assist the project team with any 3-D modeling requested by CSN, and/or clash detection through theconstructability reviews.ESTIMATING DIRECTOR – TODD O’BIERTodd, assisted by Sr. Estimator, Myreen Michael, seven other Estimators, an Estimating Assistant and three PlansCoordinators, has the capability to lead Estimating Activities for all three of the SPWB projects.Todd has been predominantly focused on conceptual estimating and budgeting with Martin-Harris Construction forthe last 21 years. His wealth of experience includes GMP development, value engineering, material, methods and
CMAR QUALIFICATIONSsystems analysis for over thirty (30) CMAR/Design-Build projects for various market sectors. His NV Public WorksCMAR experience includes projects for the Clark County School District, Southern Nevada Health District, theUniversity of Nevada Las Vegas and the Department of Aviation (McCarran International Airport).SR. ESTIMATOR – MYREEN MICHAELMyreen had 29 years of estimating experience when she joined Martin-Harris in 2013. Since then, Myreen hascompleted numerous projects in a variety of market sectors. Specific to the CMAR delivery, she has managedestimating activities through the pre-construction phase of projects for clients such as the Department of Aviation(McCarran International Airport), Switch Communications, Van Trust Real Estate, Wyndham Worldwide, the City ofHenderson, and Opportunity Village. Myreen will be supported by our team of seven other Estimators, anEstimating Assistant and three Plans Coordinators.PROJECT MANAGER – JON COX, LEED APAs demonstrated by the recent simultaneous completion of two CMAR CCSD projects, Jon has the capability and teamstructure to complete all three of the SPWB projects. If Martin-Harris should be awarded all three of the SPWB CMARprojects, Anne Folk would be assigned as a secondary Project Manager to add bench strength to the team.With a Bachelor of Science in Construction Management and a wealth of both field and project managementexperience, Jonathan brings an in-depth expertise to the pre-construction process. His relevant experience includesnumerous CMAR projects involving pre-construction and construction services, higher education and occupiedrenovation experience. Jon recently completed pre-construction services for two (2) Clark County School DistrictCMAR projects with Sr. Project Executive, Wade Pope; Director of Estimating, Todd O’Bier; and Superintendents,Kenny Folkerson & Jon Hallaway.PROJECT MANAGER – ANNE FOLKIf Martin-Harris should be awarded all three of the SPWB CMAR projects, Anne would be assigned as a secondaryProject Manager to add bench strength to Jon’s team.With a USACE Construction Quality Management for Contractors Certification and a deep CMAR portfolio as aProject Manager at Martin-Harris, Anne’s addition to Jon’s team will ensure a stellar performance for SPWB whilestreamlining communication for all three projects. Her experience includes numerous CMAR projects involving preconstruction and construction services, the Design-Build of a BEQ on a U.S. active Navy Base, and the CMARdelivery of Rainbow Dreams Academy.SUPERINTENDENT – KENNY FOLKERSONKenny joined Martin-Harris as an Apprentice Carpenter in 1982. After completing the 4-Year CarpenterApprenticeship Program in only 30 months, Kenny began an aggressively forward moving career with Martin-Harris.He has a stellar CMAR and educational project portfolio. Kenny has completed two (2) projects for the College ofSouthern Nevada, the Morse Arberry, Jr. Telecommunications Building (the 1st NV Public Works Design-Build projectand the 1st LEED Certified project in Nevada) on the North Las Vegas Campus and The Ralph and Betty Engelstad
CMAR QUALIFICATIONSSchool of Health Sciences on the Charleston Campus. Kenny recently completed pre-construction services for oneof Jon Cox’s CCSD CMAR projects (Lincoln Elementary). He also has an extraordinary safety record. Of the thirty (33)projects Martin-Harris has received AGC Safe Site awards on, Kenny was the Superintendent on seven (7) of them.SUPERINTENDENT (ALTERNATE #1) – JOHN HALLAWAYIf Martin-Harris should be awarded two of the SPWB CMAR projects, John Hallaway would be assigned as a secondary,dedicated Superintendent, ensuring 100% field supervision on each project.In his 20-year career with Martin-Harris, John has demonstrated a proven track record for project success. Hisexpertise as a superintendent in the areas of coordination, scheduling of trades, meeting deadlines on or beforeschedule due date, and meeting project budgets while ensuring excellent customer relations are just a few of themany attributes he brings to each of his endeavors. John recently completed pre-construction services for JonCox’s other CCSD CMAR project (Rex Bell Elementary).SUPERINTENDENT (ALTERNATE #3) – RANDALL MAESTASIf Martin-Harris should be awarded all three of the SPWB CMAR projects, John Hallaway would be assigned as asecondary, dedicated Superintendent, ensuring 100% field supervision on each project.Martin-Harris recruited Randall in 2012. In his 37-year construction career, Randall has completed a wide variety ofprojects, including four (4) CMAR projects for Martin-Harris, including the Southern Nevada Health District CMARwith Sr. Pre-Construction Services Director, Matt Parkins, and Estimating Director, Todd O’Bier. Randall wasresponsible for design constructability reviews, value analysis improvements, developing the phasing plan andmaster schedule throughout the pre-construction phase, then assuming field management supervision, qualitycontrol and safety implementation during construction.
CMAR QUALIFICATIONSProposed project team’s experience working together
CMAR QUALIFICATIONSProposed project team’s experience working together
CMAR QUALIFICATIONSResume: CHRIS CALUYASr. preconstruction directorTOTAL YEARS OFCONSTRUCTIONEXPERIENCE33 YEARSYEARS OFEXPERIENCEWITH CMAR20 YEARSYEARS OFEXPERIENCEWITH THIS FIRMEDUCATION: CONSTRUCTION MANAGEMENT, COLLEGE OF SOUTHERN NEVADASAMPLE RELEVANT CMAR PROJECT EXPERIENCE:College of Southern Nevada LibraryType: New ConstructionRole: CMAR Pre-construction DirectorContract: 22,000,000College of Southern Nevada Life Transitions CenterType: New ConstructionRole: CMARContract: 3,500,000College of Southern NLV Laboratory RemodelType: RenovationRole: CMAR Pre-construction DirectorContract: 8,00,000CCSD West Prep AcademyType: New ConstructionRole: CMAR Pre-construction DirectorContract: 24,000,000Las Vegas Convention Center Metro Police SubstationType: New ConstructionRole: CMAR Pre-construction DirectorContract: 16,000,000RTC SMF Mobility Training CenterType: New ConstructionRole: CMAR Pre-construction DirectorContract: 8,000,0001 YEAr
CMAR QUALIFICATIONSResume: wade popeSr. Project ExecutiveTOTAL YEARS OFCONSTRUCTIONEXPERIENCE33 YEARSYEARS OFEXPERIENCEWITH CMAR10 YEARSYEARS OFEXPERIENCEWITH THIS FIRM4 YEArSSAMPLE RELEVANT CMAR PROJECT EXPERIENCE:Within the last 4 years, Wade has managed over 265M in CMAR projects for Martin-Harris including:Northgate Distribution CenterType: New ConstructionRex Bell Elementary SchoolType: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 28,000,000Lincoln Elementary SchoolType: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 28,000,000Role: CMAR Sr. Project ExecutiveContract: 100,000,000Konami Gaming ExpansionType: New ConstructionAinsworth GamingRole: CMAR Sr. Project ExecutiveRole: CMAR Sr. Project ExecutiveLegal Aid of Southern NevadaCatamaran RXRole: CMAR Sr. Project ExecutiveRole: CMAR Sr. Project ExecutiveThatcher ChemicalType: New ConstructionContract: 30,000,000Type: New ConstructionContract: 12,000,000Harley-Davidson Las VegasType: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 9,000,000Contract: 30,000,000Type: New ConstructionContract: 13,000,000Type: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 12,000,000
CMAR QUALIFICATIONSResume: Todd O’BierEstimating directorTOTAL YEARS OFCONSTRUCTIONEXPERIENCE23 YEARSYEARS OFEXPERIENCEWITH CMAR23 YEARSYEARS OFEXPERIENCEWITH THIS FIRM23 YEArSSAMPLE RELEVANT CMAR PROJECT EXPERIENCE:Within the last 4 years, Todd has worked with Sr. Project Executive, Wade Pope, through the GMP development ofover 265M in CMAR projects (listed in Wade Pope’s resume).Rex Bell Elementary SchoolType: New ConstructionUNLV Parking GarageType: New ConstructionCatamaran RXType: New ConstructionRole: CMAR Estimating DirectorRole: CMAR Estimating DirectorRole: Design/Build Estimating DirectorLincoln Elementary SchoolUNLV RAJ Solar PV SystemRole: CMAR Estimating DirectorRole: Design/Build Estimating DirectorRole: CMAR Estimating DirectorContract: 9,000,000Contract: 30,000,000Variety SchoolThatcher ChemicalContract: 28,000,000Type: New ConstructionContract: 28,000,000Contract: 15,000,000Type: New ConstructionType: New ConstructionRole: Design/Build Estimating DirectorContract: 40,000,000Contract: 12,000,000Ainsworth GamingType: New ConstructionType: New ConstructionRole: CMAR Estimating DirectorContract: 12,000,000
CMAR QUALIFICATIONSResume: Myreen MichaelSr. estimatorTOTAL YEARS OFCONSTRUCTIONEXPERIENCE33 YEARSYEARS OFEXPERIENCEWITH CMAR4 YEARSYEARS OFEXPERIENCEWITH THIS FIRM4 YEArSSAMPLE RELEVANT CMAR PROJECT EXPERIENCE:McCarran Airport CanopiesNorthgate Distribution CenterRole: CMAR Sr. EstimatingRole: CMAR Sr. EstimatingType: New ConstructionContract: 1,900,000Type: New ConstructionContract: 100,000,000projects Myreen has providedestimates for within the last 2years alone, demonstrating herstrong foundation of localsubcontractor relationships: City of Las Vegas Courthouse Elementary School @ Farm Beckley Elementary School Elementary School @ I-15 Elementary School @ Maule Antelope Ridge Elementary Elementary School @ Lamb Clark County Public WorksMulti-Use Building Elementary School @ Ford UNLV Animal Care FacilityType: RenovationLegacy House Assisted LivingRole: CMAR Sr. EstimatingRole: CMAR Sr. EstimatingSwitch Nap Data Centers 8 & 9Opportunity VillageRole: CMAR Sr. EstimatingRole: CMAR Sr. EstimatingWyndham Hotel RenovationsType: New ConstructionThe following is a partial list ofOpportunity VillageContract: 15,000,000Type: New ConstructionContract: 15,000,000Turano BakeryType: New ConstructionRole: CMAR Sr. EstimatingContract: 12,000,000Contract: 15,000,000Type: New ConstructionContract: 24,000,000Type: Renovation 5 separate hotelsRole: CMAR Sr. EstimatingContract: 28,000,000
CMAR QUALIFICATIONSResume: Jon coxProject managerTOTAL YEARS OFCONSTRUCTIONEXPERIENCE15 YEARSYEARS OFEXPERIENCEWITH CMAR5 YEARSYEARS OFEXPERIENCEWITH THIS FIRM5 YEArSEDUCATION: BACHELOR OF SCIENCE CONSTRUCTION MANAGEMENT, WEBER STATE UNIVERSITYSAMPLE RELEVANT PROJECT EXPERIENCE:Wyndham RevereMarriott Honors ResidentialRole: CMAR Project ManagerRole: Project ManagerType: Renovation of 5 separate hotelsRex Bell Elementary SchoolType: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 28,000,000Lincoln Elementary SchoolType: New ConstructionRole: CMAR Sr. Project ExecutiveContract: 28,000,000Contract: 100,000,000Tropicana Express LaughlinType: RenovationScholars CommunityContract: 30,000,000164,000 SF five story facility includesHonors College, apartment suites, andconvenience store. Features includeRole: CMAR Project Managersteel frame structure, CMU structuralReddy Ice Manufacturingmechanical systems, and pursuingRole: CMAR Project ManagerUniversity of Utah & State of UtahContract: 3,000,000Type: RenovationContract: 750,000towers, central and individualLEED Gold Certification Owner:Bingham Entrepreneurial & EnergyResearch CenterRole: Project ManagerContract: 19,000,00070,000 SF two story facility includesbiological and chemical research labs,an entrepreneurial businessdevelopment center, and graduateresearch space. Features includeaggregate pier foundation, steelframe structure, and LEED Goldcertification. Owner: Utah StateUniversity & State of Utah
CMAR QUALIFICATIONSResume: Kenny folkersensuperintendentTOTAL YEARS OFCONSTRUCTIONEXPERIENCE35 YEARSYEARS OFEXPERIENCEWITH CMAR12 YEARSYEARS OFEXPERIENCEWITH THIS FIRM35 YEArSSAMPLE RELEVANT PROJECT EXPERIENCE:Ainsworth GamingType: New ConstructionLincoln Elementary SchoolType: New ConstructionRole: CMAR SuperintendentContract: 28,000,000Role: CMAR SuperintendentContract: 30,000,000Type: New ConstructionRole: CMAR SuperintendentContract: 17,000,000Type: New ConstructionRole: SuperintendentEast Career and Technical AcademyFiesta Casino ExpansionType: New ConstructionRole: CMAR SuperintendentContract: 73,000,000Type: New ConstructionBuilding North Las VegasWest Charleston CampusHarley-Davidson Las VegasContract: 9,000,000CSN TelecommunicationsCSN Health Sciences Building –Contract: 20,000,000Role: SuperintendentClark County Development ServicesExpansionType: New ConstructionType: New Construction & RenovationContract: 15,000,000Contract: 20,000,000Role: Design-Build SuperintendentRole: Superintendent
CMAR QUALIFICATIONSResume: john HallawayAlternate superintendent #1TOTAL YEARS OFCONSTRUCTIONEXPERIENCE28 YEARSYEARS OFEXPERIENCEWITH CMAR13 YEARSYEARS OFEXPERIENCEWITH THIS FIRM20 YEArSSAMPLE RELEVANT PROJECT EXPERIENCE:Roseman University 14BBozarth Elementary SchoolRole: CMAR SuperintendentRole: SuperintendentType: Tenant ImprovementRex Bell Elementary SchoolType: New ConstructionRole: CMAR SuperintendentContract: 28,000,000Type: New ConstructionContract: 2,700,000Contract: 19,000,000Boot BarnDusty Dickens Elementary SchoolRole: CMAR SuperintendentRole: SuperintendentType: New ConstructionType: New ConstructionContract: 3,000,000Contract: 19,000,000Manhattan CondosReedom Elementary SchoolType: New ConstructionType: New Construction & RenovationContract: 118,000,000Contract: 19,000,000Role: CMAR SuperintendentRole: SuperintendentRogich Middle SchoolType: New ConstructionRole: SuperintendentContract: 19,000,000
CMAR Q
Martin-Harris Construction has completed 3 CMAR campuses for the University of Phoenix, a tenant improvement for Kaplan College, and three renovations for Roseman University. For the University of Nevada Las Vegas, we completed the Boyd School